Kitchen refits
Full strip-out and refit, including units, worktops, tiling and electrics. We ask about appliances and layout at the survey. Typically 3 to 4 weeks depending on size.
Full strip-out and refit, including units, worktops, tiling and electrics. We ask about appliances and layout at the survey. Typically 3 to 4 weeks depending on size.
Shower, bath, tiling and plumbing. We check water pressure and waste runs first. Most bathrooms take 2 to 3 weeks.
Skimming, filling and painting. Needed after rewiring or before new flooring. We cover floors and furniture before we start.
Laminate, engineered wood, tiles and screed. We measure moisture levels and let you know if a subfloor needs work first.
Full or partial rewiring, new consumer units, pipework and radiators. We test before we quote and explain what can stay.
Load-bearing wall removal, steel beams and openings. An engineer's calculations are provided; building control paperwork and neighbour notices are handled by us.
Survey
We visit, measure and talk through what you want
Quote
You get an itemised written quote and a schedule
Build
In-house trades start on the agreed date
Sign-off
We walk through the finished work together
No. All trades are in-house, so the same people start and finish the job.
A flat can take 8 to 12 weeks; a house with structural work longer. We give you a schedule after the survey, before you commit.
Payment is split by stage. You pay an initial amount, then at agreed milestones. The itemised quote shows what each stage covers.
Yes. For structural work we provide engineer's calculations and handle building control paperwork and neighbour notices.
Sometimes, depending on the scope. We talk about it at the survey and say what is realistic for your home.
Tell us what you want to change and roughly when you want to start. We will arrange a visit to measure and talk through the options.